{"id":4340,"date":"2025-04-16T23:18:15","date_gmt":"2025-04-16T21:18:15","guid":{"rendered":"https:\/\/www.altairchemical.com\/megolo\/"},"modified":"2026-02-26T14:35:00","modified_gmt":"2026-02-26T13:35:00","slug":"megolo","status":"publish","type":"page","link":"https:\/\/www.altairchemical.com\/en\/megolo\/","title":{"rendered":"Megolo Hydropower Plant"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4803 size-full\" src=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp\" alt=\"\" width=\"800\" height=\"316\" srcset=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp 800w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG-320x126.webp 320w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG-480x190.webp 480w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n<p class=\"p1\">Located in the hamlet of Megolo, in the municipality of Pieve Vergonte, at 220 m<span class=\"Apple-converted-space\">\u00a0 <\/span>above sea level, the plant was commissioned in January 1941. It is a run-of-river power plant using water from the Toce River and part of the Anza River.<\/p>\n<p class=\"p1\"><span class=\"s1\"><strong>1. <\/strong><\/span>The intake on the Toce River is located in Prata, in the municipality of Vogogna, and features a dam originally made up of four gates, increased to six in the early 1990s at the request of the Po River Authority for hydraulic regulation, for a total width of 115 m.<\/p>\n<p class=\"p2\">The dam includes a <span class=\"s1\"><b>fish ladder<\/b><\/span> to facilitate fish migration.<\/p>\n<p class=\"p1\"><span class=\"s1\"><strong>2. <\/strong><\/span>The total water flow used is <span class=\"s1\"><b>75 m\u00b3\/sec<\/b><\/span>, including <span class=\"s1\"><b>64 m\u00b3\/sec<\/b><\/span> from the Toce River and <span class=\"s1\"><b>11 m\u00b3\/sec<\/b><\/span> <span class=\"Apple-converted-space\">\u00a0 <\/span>discharged from the Edison Power Plant via the Anza River.<\/p>\n<p class=\"p2\">From the intake on the Toce River, a <span class=\"s1\"><b>free-surface trapezoidal channel<\/b><\/span> extends for approximately 4.95 km, with an average width of 15 m and a height of 4 m.<\/p>\n<p class=\"p1\"><strong><span class=\"s1\">3. <\/span><\/strong>Approximately 600 m downstream from the intake screens, the channel includes three additional <span class=\"s1\"><b>inlet gates<\/b><\/span> to regulate the water flow into the Megolo power station.<\/p>\n<p class=\"p1\"><span class=\"s1\"><strong>4. <\/strong><\/span><span class=\"s1\"><b>FIRST TUNNEL<\/b><\/span> \u2013 The first tunnel crosses the Anza River and is <span class=\"s1\"><b>500 m long<\/b><\/span>, with a <span class=\"s1\"><b>twin-barrel structure<\/b><\/span>.<\/p>\n<p class=\"p2\">Around 1.5 km from the start of the intake channel, the <span class=\"s1\"><b>discharge channel<\/b><\/span> from the Edison Plant joins the flow.<\/p>\n<p class=\"p1\"><span class=\"s1\"><strong>5. <\/strong><\/span><span class=\"s1\"><b>SECOND TUNNEL<\/b><\/span> \u2013 The second tunnel crosses the Arsa stream at the Rumianca site. It is <span class=\"s1\"><b>150 m<span class=\"Apple-converted-space\">\u00a0 <\/span>long<\/b><\/span>, and also features a <span class=\"s1\"><b>twin-barrel design<\/b><\/span>.<\/p>\n<p class=\"p1\"><em><span class=\"s1\"><b><strong>6. <\/strong><\/b><\/span><\/em><span class=\"s1\"><b>Water Intake at Megolo Power Plant<\/b><\/span> \u2013 Before reaching the turbines, the water goes through four <span class=\"s1\"><b>screens<\/b><\/span> (two per turbine), each measuring <span class=\"s1\"><b>5.50 m high and 3.85 m wide<\/b><\/span>. Each screen is kept clean by a dedicated <span class=\"s1\"><b>rake system<\/b><\/span>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3937\" src=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2025\/04\/megolo_aprofondimento_03.webp\" alt=\"\" width=\"800\" height=\"319\" srcset=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2025\/04\/megolo_aprofondimento_03.webp 800w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2025\/04\/megolo_aprofondimento_03-320x128.webp 320w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2025\/04\/megolo_aprofondimento_03-480x191.webp 480w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><strong><em><span class=\"s1\">7. <\/span><\/em><\/strong>The power station is equipped with <span class=\"s1\"><b>two vertical generator units<\/b><\/span>, installed in 2010, each rated<span class=\"Apple-converted-space\">\u00a0 <\/span><span class=\"s1\"><b>5,400 kVA<\/b><\/span> and operating at <span class=\"s1\"><b>9,000 V<\/b><\/span>.<\/p>\n<p><strong><em><span class=\"s1\">8. <\/span><\/em><\/strong><span class=\"s1\"><b>Two Kaplan turbines<\/b><\/span>, each with a <span class=\"s1\"><b>3.75 MW<\/b><\/span> power output, operating at <span class=\"s1\"><b>214 rpm<\/b><\/span>, are coupled with the generators.<\/p>\n<p>The <span class=\"s1\"><b>maximum power output<\/b><\/span> of the Megolo plant is approximately <span class=\"s1\"><b>6.5 MW<\/b><\/span>. Each unit handles a <span class=\"s1\"><b>37.5 m\u00b3\/sec<\/b><\/span> water flow<span class=\"Apple-converted-space\">\u00a0 <\/span>with an effective head of <span class=\"s1\"><b>10.85 m<\/b><\/span>.<br \/>\nThe <span class=\"s1\"><b>discharge channel<\/b><\/span> from the plant is approximately <span class=\"s1\"><b>1.5 km long<\/b><\/span>, and returns the water to the Toce River.<br \/>\nThe electricity generated is conveyed to the industrial site via an <span class=\"s1\"><b>overhead double-circuit line<\/b><\/span>, operating at <span class=\"s1\"><b>9,000 volts<\/b><\/span>, with a length of approximately <span class=\"s1\"><b>2.8 km<\/b><\/span>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Located in the hamlet of Megolo, in the municipality of Pieve Vergonte, at 220 m\u00a0 above sea level, the plant was commissioned in January 1941. It is a run-of-river power plant using water from the Toce River and part of the Anza River. 1. The intake on the Toce River is located in Prata, in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-approfondimento.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-4340","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Megolo Hydropower Plant - Altair chemical<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Megolo Hydropower Plant - Altair chemical\" \/>\n<meta property=\"og:description\" content=\"Located in the hamlet of Megolo, in the municipality of Pieve Vergonte, at 220 m\u00a0 above sea level, the plant was commissioned in January 1941. It is a run-of-river power plant using water from the Toce River and part of the Anza River. 1. The intake on the Toce River is located in Prata, in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.altairchemical.com\/en\/megolo\/\" \/>\n<meta property=\"og:site_name\" content=\"Altair chemical\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-26T13:35:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"316\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/\",\"name\":\"Megolo Hydropower Plant - Altair chemical\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/megolo_aprofondimento_ENG.webp\",\"datePublished\":\"2025-04-16T21:18:15+00:00\",\"dateModified\":\"2026-02-26T13:35:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/megolo_aprofondimento_ENG.webp\",\"contentUrl\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/megolo_aprofondimento_ENG.webp\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/megolo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Megolo Hydropower Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/\",\"name\":\"Altair chemical\",\"description\":\"Chimica responsabile: ne rendiamo possibile lo sviluppo ogni giorno\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Megolo Hydropower Plant - Altair chemical","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Megolo Hydropower Plant - Altair chemical","og_description":"Located in the hamlet of Megolo, in the municipality of Pieve Vergonte, at 220 m\u00a0 above sea level, the plant was commissioned in January 1941. It is a run-of-river power plant using water from the Toce River and part of the Anza River. 1. The intake on the Toce River is located in Prata, in [&hellip;]","og_url":"https:\/\/www.altairchemical.com\/en\/megolo\/","og_site_name":"Altair chemical","article_modified_time":"2026-02-26T13:35:00+00:00","og_image":[{"width":800,"height":316,"url":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.altairchemical.com\/en\/megolo\/","url":"https:\/\/www.altairchemical.com\/en\/megolo\/","name":"Megolo Hydropower Plant - Altair chemical","isPartOf":{"@id":"https:\/\/www.altairchemical.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.altairchemical.com\/en\/megolo\/#primaryimage"},"image":{"@id":"https:\/\/www.altairchemical.com\/en\/megolo\/#primaryimage"},"thumbnailUrl":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp","datePublished":"2025-04-16T21:18:15+00:00","dateModified":"2026-02-26T13:35:00+00:00","breadcrumb":{"@id":"https:\/\/www.altairchemical.com\/en\/megolo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.altairchemical.com\/en\/megolo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.altairchemical.com\/en\/megolo\/#primaryimage","url":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp","contentUrl":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2026\/02\/megolo_aprofondimento_ENG.webp"},{"@type":"BreadcrumbList","@id":"https:\/\/www.altairchemical.com\/en\/megolo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.altairchemical.com\/en\/"},{"@type":"ListItem","position":2,"name":"Megolo Hydropower Plant"}]},{"@type":"WebSite","@id":"https:\/\/www.altairchemical.com\/en\/#website","url":"https:\/\/www.altairchemical.com\/en\/","name":"Altair chemical","description":"Chimica responsabile: ne rendiamo possibile lo sviluppo ogni giorno","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.altairchemical.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/pages\/4340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/comments?post=4340"}],"version-history":[{"count":5,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/pages\/4340\/revisions"}],"predecessor-version":[{"id":5197,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/pages\/4340\/revisions\/5197"}],"wp:attachment":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/media?parent=4340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}