{"id":4985,"date":"2021-10-29T15:13:33","date_gmt":"2021-10-29T13:13:33","guid":{"rendered":"https:\/\/www.altairchemical.com\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/"},"modified":"2021-10-29T15:13:33","modified_gmt":"2021-10-29T13:13:33","slug":"hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action","status":"publish","type":"post","link":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/","title":{"rendered":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action"},"content":{"rendered":"<p>In June 2021, the so-called (now former) \u201cExtractive\u201d plant, an extractive distillation facility built in 1999, was reactivated and now converted for traditional distillation.<\/p>\n<p>The conversion occurred as part of the innovative industrial plan developed by the Esseco Group, which included a \u20ac45 million investment and the acquisition of Hydrochem Italia in 2019. The operation\u2019s primary and largely achieved goal was to improve the energy efficiency of Hydrochem Italia\u2019s facilities. <\/p>\n<p><strong>History<\/strong><\/p>\n<p>The extractive distillation plant at the Pieve Vergonte industrial site was constructed in 1999 for the production of dichlorotoluenes. Always known as the \u201cExtractive,\u201d the plant consists of a series of three distillation columns, each 54 meters tall, capable of producing about 2,500 tons\/year of products. It remained operational for about a decade but was permanently shut down in 2010 due to low productivity, which made its operation economically unfeasible.  <\/p>\n<p>In 2019, following the <a href=\"https:\/\/www.hydrochemitalia.it\/blog\/esseco-group-acquisisce-hydrochem-italia\/\" target=\"_blank\" rel=\"noopener\">acquisition of Hydrochem Italia<\/a>, the Esseco Group initiated a <a href=\"https:\/\/www.hydrochemitalia.it\/blog\/pieve-vergonte-riparte-a-tempo-di-record-dalla-produzione-di-cloro-potassa\/\" target=\"_blank\" rel=\"noopener\">relaunch program for the Pieve production site<\/a>. The initial plan did not include restarting the former \u201cExtractive\u201d; however, after a detailed technical-economic analysis, the Esseco Group, through Hydrochem Italia, decided to further invest in reactivating the plant, increasing its efficiency and productivity, with the strategic goal of enhancing and improving the quality of the products made in the chloroaromatics production department.<\/p>\n<p>At the end of 2020, a program of revamping and extraordinary maintenance was initiated to convert the plant\u2019s operation from extractive distillation to traditional distillation, increasing the production capacity of the current monochlorotoluenes plant.<\/p>\n<p>In June 2021, the former \u201cExtractive\u201d was reactivated and, thanks to the new facility, Hydrochem Italia is now able to increase the production capacity of chloroaromatic products by 20%, reaching approximately 25,000 tons\/year, supporting the continuously growing and developing agrochemical and pharmaceutical markets.<\/p>\n<p>This new plant integration has also enabled Hydrochem Italia to improve its energy efficiency, ensuring savings in steam use and consequently natural gas.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-516\" src=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-1024x768.jpg 1024w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-1600x1200.jpg 1600w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-320x240.jpg 320w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-1300x975.jpg 1300w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-480x360.jpg 480w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1-800x600.jpg 800w, https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/foto-ok-2048x1536-1.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In June 2021, the so-called (now former) \u201cExtractive\u201d plant, an extractive distillation facility built in 1999, was reactivated and now converted for traditional distillation. The conversion occurred as part of the innovative industrial plan developed by the Esseco Group, which included a \u20ac45 million investment and the acquisition of Hydrochem Italia in 2019. The operation\u2019s [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1378,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[41],"tags":[],"class_list":["post-4985","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical\" \/>\n<meta property=\"og:description\" content=\"In June 2021, the so-called (now former) \u201cExtractive\u201d plant, an extractive distillation facility built in 1999, was reactivated and now converted for traditional distillation. The conversion occurred as part of the innovative industrial plan developed by the Esseco Group, which included a \u20ac45 million investment and the acquisition of Hydrochem Italia in 2019. The operation\u2019s [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/\" \/>\n<meta property=\"og:site_name\" content=\"Altair chemical\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-29T13:13:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dual\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dual\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/\"},\"author\":{\"name\":\"Dual\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#\\\/schema\\\/person\\\/cf725e43592322663a5ec149e85bbd65\"},\"headline\":\"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action\",\"datePublished\":\"2021-10-29T13:13:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/\"},\"wordCount\":321,\"image\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/evidenza.png\",\"articleSection\":[\"All news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/\",\"name\":\"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/evidenza.png\",\"datePublished\":\"2021-10-29T13:13:33+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#\\\/schema\\\/person\\\/cf725e43592322663a5ec149e85bbd65\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/evidenza.png\",\"contentUrl\":\"https:\\\/\\\/www.altairchemical.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/evidenza.png\",\"width\":1200,\"height\":628},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/\",\"name\":\"Altair chemical\",\"description\":\"Chimica responsabile: ne rendiamo possibile lo sviluppo ogni giorno\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.altairchemical.com\\\/en\\\/#\\\/schema\\\/person\\\/cf725e43592322663a5ec149e85bbd65\",\"name\":\"Dual\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g\",\"caption\":\"Dual\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical","og_description":"In June 2021, the so-called (now former) \u201cExtractive\u201d plant, an extractive distillation facility built in 1999, was reactivated and now converted for traditional distillation. The conversion occurred as part of the innovative industrial plan developed by the Esseco Group, which included a \u20ac45 million investment and the acquisition of Hydrochem Italia in 2019. The operation\u2019s [&hellip;]","og_url":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/","og_site_name":"Altair chemical","article_published_time":"2021-10-29T13:13:33+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png","type":"image\/png"}],"author":"Dual","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dual","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#article","isPartOf":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/"},"author":{"name":"Dual","@id":"https:\/\/www.altairchemical.com\/en\/#\/schema\/person\/cf725e43592322663a5ec149e85bbd65"},"headline":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action","datePublished":"2021-10-29T13:13:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/"},"wordCount":321,"image":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#primaryimage"},"thumbnailUrl":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png","articleSection":["All news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/","url":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/","name":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action - Altair chemical","isPartOf":{"@id":"https:\/\/www.altairchemical.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#primaryimage"},"image":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#primaryimage"},"thumbnailUrl":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png","datePublished":"2021-10-29T13:13:33+00:00","author":{"@id":"https:\/\/www.altairchemical.com\/en\/#\/schema\/person\/cf725e43592322663a5ec149e85bbd65"},"breadcrumb":{"@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#primaryimage","url":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png","contentUrl":"https:\/\/www.altairchemical.com\/wp-content\/uploads\/2024\/08\/evidenza.png","width":1200,"height":628},{"@type":"BreadcrumbList","@id":"https:\/\/www.altairchemical.com\/en\/hydrochem-doesnt-stop-after-10-years-the-extractive-distillation-plant-is-back-in-action\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.altairchemical.com\/en\/"},{"@type":"ListItem","position":2,"name":"Hydrochem doesn\u2019t stop! After 10 years, the extractive distillation plant is back in action"}]},{"@type":"WebSite","@id":"https:\/\/www.altairchemical.com\/en\/#website","url":"https:\/\/www.altairchemical.com\/en\/","name":"Altair chemical","description":"Chimica responsabile: ne rendiamo possibile lo sviluppo ogni giorno","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.altairchemical.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.altairchemical.com\/en\/#\/schema\/person\/cf725e43592322663a5ec149e85bbd65","name":"Dual","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/17b9fd1cec041e83cba5ec9ced9289f4cf4bb0104d94306b2e14e47d17680c91?s=96&d=mm&r=g","caption":"Dual"}}]}},"_links":{"self":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/posts\/4985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/comments?post=4985"}],"version-history":[{"count":0,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/posts\/4985\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/media\/1378"}],"wp:attachment":[{"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/media?parent=4985"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/categories?post=4985"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.altairchemical.com\/en\/wp-json\/wp\/v2\/tags?post=4985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}